The pictures to the left are the milling machines loading the millings into a truck for transport. Some of the millings will be used for shoulder work and some will be hauled away.
Some of the 4 1/2 inch remove and replace is being put down today and a lot of the prep work is finished.
No one can say these guys are not on top of things. today (Tuesday) TSC is out checking the work for quality. They will be back as the job progresses.
Thank you Barb Appelhans for the pics.
Posted by Ken